Fieldforce is built around five primitives — the same five whether you're deploying 5G small cells in Munich, commissioning chargers in Texas, or provisioning 8,400 IoT gateways across six metros.
Don't model your business around the platform. Model the platform around your business — using primitives that don't care if it's a tower, a charger, or a gateway.
Every location, with its permits, history, photos, and assets, on one timeline.
Every tower, charger, gateway, and splice — modeled, monitored, maintained.
Every deployment, repair, and inspection — scheduled, dispatched, closed with evidence.
Every photo, GPS pin, signature, and test result — verified before a work order closes.
Reads from your OSS/BSS, writes back to your ERP, talks OCPP, MQTT, SNMP.
SOC 2 Type II, ISO 27001, region-pinned residency, immutable audit log.
From site acquisition to close-out, every team — RF, civil, integration, NOC, finance — sees the same timeline in their language, on their device. The work order doesn't close until the evidence agrees.
Most "AI" in infrastructure software summarizes dashboards. Ours takes action. Fieldforce agents schedule the next crew, validate the last photo, predict the SLA breach you haven't seen yet — and close the loop so your team can stop chasing it.
Watch a permit fail.
Watch the day reschedule itself.
Dispatch reroutes against permits, weather, parts availability, and SLA risk. When a permit slips at 7:14 AM, your crew is at the next viable site by 7:23.
Cuts crew-day waste 18–24% in the first 90 days.
Fieldforce reads from your existing systems and writes back to them. Your CRM stays the system of record for customers, your ERP for finance, your NOC for telemetry — and Fieldforce becomes the system of record for the field.
ERP & FINANCE
OSS / BSS
CHARGING PROTOCOLS
ITSM & NOC
IDENTITY
DEVICE & TELEMETRY
Don't see yours? We build new integrations in 1–4 weeks. Talk to engineering.
First site live in 24 hours. No code. No SI. No quarter-long onboarding.